innerbannerimg
Rural Godowns

1. Rural Godowns – NABARD

  • Rural Godown (RG) and AMIGS Scheme- Time Limit for submission of final subsidy claims to NABARD – 2014-15 Click Here
  • Revised Normative Costs Click Here
  • Rural Godown- Ceiling on subsidy Click Here
  • Gramin BhandaranYojana- Multiple Godowns at the same survey number Click Here
  • Continuation during 2013-2014 Click Here
  • Waiver of minimum Bank Loan for cases sanctioned by banks during XI FYP Click Here
  • Eligibility of Pre-engineered building structure Godowns Click Here
  • Time limit (Final) for conduct of Joint Inspections for which advance subsidy was released by NABARDupto2011-12 (new) Click Here
    • Rural Godown and AMIGS Schemes- Time Limit for conducting JMI and submission of Final Subsidy cliams to NABARD Click Here
    • Rural Godown and AMIGS Schemes- Time Limit for conducting Joint Inspection of Projects sanctioned subsidy during 2012-13 and 2013-14 Click Here

2. Rural Godowns – AGMARKET

  • Revised Operational Guidelines of the Scheme (Effective from 26.06.2008) Click Here
  • Revision of Capital investment subsidy for construction/renovation of Rural Godowns Click Here
  • Addresses of Rural Godowns Click Here
  • Statement showing progress of Rural Godown Scheme (Position as on 31/03/2014 - Cumulative (Physical) Click Here
  • Progress of Rural Godown Scheme - Subsidy sanctioned and released by NABARD & NCDC (construction + renovation) (Position as on 31/03/2014) - Cumulative (Financial) Click Here
  • Evaluation report of Rural Godown Scheme Click Here

Supported By :

nabardimg

Number of Visitors: statistics in vBulletin

Protected under trademark and copyright Act 1957.